Atıflar

Filtrele
  • Citing Source:
    Zhou, Zhen; Chu, Feng; Che, Ada; et al.; Zhou, MengChu, epsilon-Constraint and Fuzzy Logic-Based Optimization of Hazardous Material Transportation via Lane Reservation, IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, vol. 14, pp. 847-857, JUN 2013
    Cited Source:
    Erkut E.; Alp, O.; Designing a Road Network for Hazardous Materials Shipments, COMPUTERS & OR, vol. 34, pp. 1389-1405, 2007
  • Citing Source:
    Chandra, Shailesh; Quadrifoglio, Luca, A model for estimating the optimal cycle length of demand responsive feeder transit services, TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, vol. 51, pp. 1-16, MAY 2013
    Cited Source:
    Alp, O., Erkip, N. K.; and Gullu, R. Optimal Lot Sizing/Vehicle Dispatching Policies under Stochastic Lead Times and Stepwise Fixed Costs, OPERATIONS RESEARCH. Vol. 53, pp. 160-166 2003
  • Citing Source:
    Li, Xiang; Li, Yongjian; Cai, Xiaoqiang, Double marginalization and coordination in the supply chain with uncertain supply, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 226, pp. 228-236, APR 2013
    Cited Source:
    Pac, M.F.; Alp, O.; Tan, T.; Integrated Workforce Capacity and Inventory Management Under Temporary Labor Supply Uncertainty, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, vol. 47, pp. 4281 – 4304, 2009
  • Citing Source:
    Ma, Changxi; Li, Yinzhen; He, Ruichun; et al.; Wu, Fang; Qi, Bo; Ye, Qing, Route optimisation models and algorithms for hazardous materials transportation under different environments, INTERNATIONAL JOURNAL OF BIO-INSPIRED COMPUTATION, vol. 5, pp. 252-265, 2013
    Cited Source:
    Erkut E.; Alp, O.; Designing a Road Network for Hazardous Materials Shipments, COMPUTERS & OR, vol. 34, pp. 1389-1405, 2007
  • Citing Source:
    Timmer, Judith; Chessa, Michela; Boucherie, Richard J. Cooperation and game-theoretic cost allocation in stochastic inventory models with continuous review, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, Vol. 231, pp. 567-576, DEC 2013
    Cited Source:
    Tanrikulu, M.M.; Sen, A.; and Alp, O. A Joint Replenishment Policy with Individual Control and Constant Size Orders. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, vol. 48, pp. 4253 – 4271, 2010
  • Citing Source:
    Toumazis, Iakovos; Kwon, Changhyun, Routing hazardous materials on time-dependent networks using conditional value-at-risk, TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, Vol. 37, pp. 73-92, DEC 2013
    Cited Source:
    Erkut E.; Alp, O.; Designing a Road Network for Hazardous Materials Shipments, COMPUTERS & OR, vol. 34, pp. 1389-1405, 2007
  • Citing Source:
    Fernandes, Rui; Gouveia, Borges; Pinho, Carlos, A real options approach to labour shifts planning under different service level targets, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 231, pp. 182-189, NOV 2013
    Cited Source:
    Pac, M.F.; Alp, O.; Tan, T.; Integrated Workforce Capacity and Inventory Management Under Temporary Labor Supply Uncertainty, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, vol. 47, pp. 4281 – 4304, 2009
  • Citing Source:
    Buyukkaramikli, Nasuh C.; Bertrand, J. Will M.; van Ooijen, Henny P. G., Flexible hiring in a make to order system with parallel processing units, ANNALS OF OPERATIONS RESEARCH, vol. 209, pp. 159-178, OCT 2013
    Cited Source:
    Alp, O. and an, T. Tactical Capacity Management under Capacity Flexibility in Make-to-Stock Systems”. IIE TRANSACTIONS, vol. 40, pp. 221 – 237, 2008
  • Citing Source:
    Dolgui, Alexandre; Ben Ammar, Oussama; Hnaien, Faicel; Louly, Mohamed Aly O., A State of the Art on Supply Planning and Inventory Control under Lead Time Uncertainty, STUDIES IN INFORMATICS AND CONTROL, vol. 22, pp. 255-268, SEP 2013
    Cited Source:
    Alp, O., Erkip, N. K.; and Gullu, R. Optimal Lot Sizing/Vehicle Dispatching Policies under Stochastic Lead Times and Stepwise Fixed Costs, OPERATIONS RESEARCH. Vol. 53, pp. 160-166 2003
  • Citing Source:
    Xu, Jiuping; Gang, Jun; Lei, Xiao, Hazmats Transportation Network Design Model with Emergency Response under Complex Fuzzy Environment, MATHEMATICAL PROBLEMS IN ENGINEERING, Article Number: 517372, 2013
    Cited Source:
    Erkut E.; Alp, O.; Designing a Road Network for Hazardous Materials Shipments, COMPUTERS & OR, vol. 34, pp. 1389-1405, 2007
  • Citing Source:
    Gzara, Fatma, A cutting plane approach for bilevel hazardous material transport network design, OPERATIONS RESEARCH LETTERS, vol. 41, pp. 40-46, JAN 2013
    Cited Source:
    Erkut E.; Alp, O.; Designing a Road Network for Hazardous Materials Shipments, COMPUTERS & OR, vol. 34, pp. 1389-1405, 2007
  • Citing Source:
    Buyukkaramikli, Nasuh C.; Bertrand, J. Will M.; van Ooijen, Henny P. G., Periodic capacity management under a lead-time performance constraint, OR SPECTRUM, vol. 35, pp. 221-249, JAN 2013
    Cited Source:
    Mincsovicz, G.; Tan, T.; Alp, O., Integrated Capacity and Inventory Management with Capacity Acquisition Lead Times. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 196, pp. 949 – 958, 2009
  • Citing Source:
    Buyukkaramikli, Nasuh C.; Bertrand, J. Will M.; van Ooijen, Henny P. G., Periodic capacity management under a lead-time performance constraint, OR SPECTRUM, vol. 35, pp. 221-249, JAN 2013
    Cited Source:
    Tan, T.; Alp, O., An Integrated Approach to Inventory and Flexible Capacity Management Under Non-stationary Stochastic Demand and Set-up Costs. OR Spectrum, vol. 31, pp. 337 – 360, 2008
  • Citing Source:
    Brimberg, Jack; Drezner, Zvi, A new heuristic for solving the p-median problem in the plane, COMPUTERS & OPERATIONS RESEARCH, vol. 40, pp. 427-437, JAN 2013
    Cited Source:
    Alp, O., Drezner, Z.; Erkut, E., An Efficient Genetic Algorithm for the p-Median Problem, ANNALS OF OPERATIONS RESEARCH, vol. 122, pp. 21-42, 2003
  • Citing Source:
    Zhu, Yueni; Zheng, Zheng; Zhang, Xiaoyi; Cai, Kaiyuan, The r-interdiction median problem with probabilistic protection and its solution algorithm, COMPUTERS & OPERATIONS RESEARCH, vol. 40, pp. 451-462, JAN 2013
    Cited Source:
    Alp, O., Drezner, Z.; Erkut, E., An Efficient Genetic Algorithm for the p-Median Problem, ANNALS OF OPERATIONS RESEARCH, vol. 122, pp. 21-42, 2003
  • Citing Source:
    Zhu, Wanshan; Wu, Zhengping,The stochastic ordering of mean-preserving transformations and its applications, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 239, pp. 802-809, DEC 2014
    Cited Source:
    Alp, O., Erkip, NK.; Gullu, R., Outsourcing Logistics: Design of Contracts Between a Manufacturer and a Transporter”, TRANSPORTATION SCIENCE, vol. 371, pp. 23-39, 2003
  • Citing Source:
    Mahmoudabadi, Abbas; Seyedhosseini, Seyed Mohammad; Solving Hazmat Routing Problem in chaotic damage severity network under emergency environment, TRANSPORT POLICY, vol. 36, pp. 34-45, NOV 2014
    Cited Source:
    Erkut E.; Alp, O.; Designing a Road Network for Hazardous Materials Shipments, COMPUTERS & OR, vol. 34, pp. 1389-1405, 2007
  • Citing Source:
    Kocaturk, Fatih; Ozpeynirci, Ozgur, Variable neighborhood search for the pharmacy duty scheduling problem, COMPUTERS & OPERATIONS RESEARCH, vol. 51, pp. 218-226, NOV 2014
    Cited Source:
    Alp, O., Drezner, Z.; Erkut, E., An Efficient Genetic Algorithm for the p-Median Problem, ANNALS OF OPERATIONS RESEARCH, vol. 122, pp. 21-42, 2003
  • Citing Source:
    Drezner, Tammy, Drezner, Zvi, The maximin gradual cover location problem, OR SPECTRUM, vol. 36, pp. 903-921, OCT 2014
    Cited Source:
    Alp, O., Drezner, Z.; Erkut, E., An Efficient Genetic Algorithm for the p-Median Problem, ANNALS OF OPERATIONS RESEARCH, vol. 122, pp. 21-42, 2003
  • Citing Source:
    Sarker, Bhaba R., Consignment stocking policy models for supply chain systems: A critical review and comparative perspectives, INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, vol. 155, pp. 52-67, SEP 2014
    Cited Source:
    Alp, O., Erkip, NK.; Gullu, R., Outsourcing Logistics: Design of Contracts Between a Manufacturer and a Transporter”, TRANSPORTATION SCIENCE, vol. 371, pp. 23-39, 2003
  • Citing Source:
    Medal, Hugh R.; Pohl, Edward A.; Rossetti, Manuel D.; A multi-objective integrated facility location-hardening model: Analyzing the pre- and post-disruption tradeoff, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 237, pp. 257-270, AUG 16 2014
    Cited Source:
    Alp, O., Drezner, Z.; Erkut, E., An Efficient Genetic Algorithm for the p-Median Problem, ANNALS OF OPERATIONS RESEARCH, vol. 122, pp. 21-42, 2003
  • Citing Source:
    Niroomand, Iman; Kuzgunkaya, Onur; Bulgak, Akif Asil; The effect of system configuration and ramp-up time on manufacturing system acquisition under uncertain demand, COMPUTERS & INDUSTRIAL ENGINEERING, vol. 73, pp. 61-74, JUL 2014
    Cited Source:
    Mincsovicz, G.; Tan, T.; Alp, O., Integrated Capacity and Inventory Management with Capacity Acquisition Lead Times. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 196, pp. 949 – 958, 2009
  • Citing Source:
    Wei, Ran; Murray, Alan T.; A multi-objective evolutionary algorithm for facility dispersion under conditions of spatial uncertainty, JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, vol. 65, pp. 1133-1142, JUL 2014
    Cited Source:
    Alp, O., Drezner, Z.; Erkut, E., An Efficient Genetic Algorithm for the p-Median Problem, ANNALS OF OPERATIONS RESEARCH, vol. 122, pp. 21-42, 2003
  • Citing Source:
    Medal, Hugh R.; Rainwater, Chase E.; Pohl, Edward A.; Rossetti, Manuel D.; A bi-objective analysis of the r-all-neighbor p-center problem, COMPUTERS & INDUSTRIAL ENGINEERING, vol. 72, pp. 114-128, JUN 2014
    Cited Source:
    Alp, O., Drezner, Z.; Erkut, E., An Efficient Genetic Algorithm for the p-Median Problem, ANNALS OF OPERATIONS RESEARCH, vol. 122, pp. 21-42, 2003
  • Citing Source:
    Aloulou, Mohamed Ali; Dolgui, Alexandre; Kovalyov, Mikhail Y.; A bibliography of non-deterministic lot-sizing models, INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, vol. 52, pp. 2293-2310, APR 2014
    Cited Source:
    Alp, O., Erkip, N. K.; and Gullu, R. Optimal Lot Sizing/Vehicle Dispatching Policies under Stochastic Lead Times and Stepwise Fixed Costs, OPERATIONS RESEARCH. Vol. 53, pp. 160-166 2003
  • Citing Source:
    Bruglieri, Maurizio; Cappanera, Paola; Nonato, Maddalena; The Gateway Location Problem: Assessing the impact of candidate site selection policies, DISCRETE APPLIED MATHEMATICS, vol. 165, pp. 96-111, MAR 2014
    Cited Source:
    Erkut E.; Alp, O.; Designing a Road Network for Hazardous Materials Shipments, COMPUTERS & OR, vol. 34, pp. 1389-1405, 2007
  • Citing Source:
    Berglund, Paul G.; Kwon, Changhyun; Robust Facility Location Problem for Hazardous Waste Transportation, NETWORKS & SPATIAL ECONOMICS, vol. 14, pp. 91-116, MAR 2014
    Cited Source:
    Erkut E.; Alp, O.; Designing a Road Network for Hazardous Materials Shipments, COMPUTERS & OR, vol. 34, pp. 1389-1405, 2007
  • Citing Source:
    Bronfman, Andres; Marianov, Vladimir; Paredes-Belmar, German; Lueer-Villagra, Armin; The maximin HAZMAT routing problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 241, pp. 15-27, FEB 2014
    Cited Source:
    Erkut E.; Alp, O.; Designing a Road Network for Hazardous Materials Shipments, COMPUTERS & OR, vol. 34, pp. 1389-1405, 2007:
  • Citing Source:
    Lee, Chia-Yen; Johnson, Andrew L.; Proactive data envelopment analysis: Effective production and capacity expansion in stochastic environments, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 232, pp. 537-548, FEB 2014
    Cited Source:
    Alp, O.; Tan, T.; Tactical Capacity Management under Capacity Flexibility in Make-to-Stock Systems. IIE TRANSACTIONS, vol. 40, pp. 221 – 237, 2008
  • Citing Source:
    Lopez-Monzalvo, Francisco; Brizuela, Carlos A.; An experimental analysis of the p-median problem under uncertainty: an evolutionary algorithm approach, EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, vol. 8,pp. 554-578, 2014
    Cited Source:
    Alp, O., Drezner, Z.; Erkut, E., An Efficient Genetic Algorithm for the p-Median Problem, ANNALS OF OPERATIONS RESEARCH, vol. 122, pp. 21-42, 2003
  • Citing Source:
    Eng-Larsson, Fredrik; Norrman, Andreas; Modal shift for greener logistics - exploring the role of the contract, INTERNATIONAL JOURNAL OF PHYSICAL DISTRIBUTION & LOGISTICS MANAGEMENT, vol. 44, pp. 721-743, 2014
    Cited Source:
    Alp, O., Erkip, NK.; Gullu, R., Outsourcing Logistics: Design of Contracts Between a Manufacturer and a Transporter”, TRANSPORTATION SCIENCE, vol. 371, pp. 23-39, 2003
  • Citing Source:
    Wang, Lin; Qu, Hui; Liu, Shan; Chen, Can; Optimizing the Joint Replenishment and Channel Coordination Problem under Supply Chain Environment Using a Simple and Effective Differential Evolution Algorithm, DISCRETE DYNAMICS IN NATURE AND SOCIETY, Article Number: 709856, 2014
    Cited Source:
    Buyukkaramikli, NC.; Gurler, U.; Alp, O.Coordinated Logistics: Joint Replenishment with Capacitated Transportation for a Supply Chain, PRODUCTION AND OPERATIONS MANAGEMENT, vol. 23, pp. 110 – 126, 2014
  • Citing Source:
    Lueer-Villagra, Armin Marianov, Vladimir, A competitive hub location and pricing problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 231 (3), pp. 734-744, Dec, 2013.
    Cited Source:
    B.Y Kara, M.R. Taner, "Hub Location Problems: The Location of Interacting Facilities," in Foundations of Location Analysis, (Edited by H.A. Eiselt and V. Marianov). pp: 273-288, Springer’s International Series in Operations Research and Management Science, Springer, 2011.
  • Citing Source:
    Schneider, Michael; Sand, Bastian; Stenger, Andreas, A note on the time travel approach for handling time windows in vehicle routing problems, COMPUTERS & OPERATIONS RESEARCH, vol. 40 (10), pp. 2564-2584, OCT 2013.
    Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE TRANSACTIONS, 34 (9), 803-811, Sep 2002.
  • Citing Source:
    Shafiee, Mahmood; Chukova, Stefanka, Maintenance models in warranty: A literature review, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 229 (3), 561-572, SEP 2013.
    Cited Source:
    Samatlı-Paç G., Taner M.R., "The role of Repair Strategy in Warranty Cost Minimization: An Investigation via Quasi-renewal Processes," European Journal of Operational Research, vol. 197 (2), pp. 632-641, 2009.
  • Citing Source:
    Bhat, Surendra S.; Narayanan, Ram M.; Rangaswamy, Muralidhar, Bandwidth Sharing and Scan Scheduling in Multimodal Radar with Communications and Tracking, IETE JOURNAL OF RESEARCH, vol. 59 (5), pp. 551-562, SEP-OCT 2013.
    Cited Source:
    Taner M.R., Karaşan O.E., and Yavuztürk E., “Scheduling Beams with Different Priorities on a Military Surveillance Radar,” IEEE Transactions on Aerospace and Electronic Systems, vol.48. no.2, 1725-1739, 2012.
  • Citing Source:
    Lei, Ting L., Identifying Critical Facilities in Hub-and-Spoke Networks: A Hub Interdiction Median Problem, GEOGRAPHICAL ANALYSIS, vol. 45 (2), pp. 105-122, APR 2013.
    Cited Source:
    B.Y Kara, M.R. Taner, "Hub Location Problems: The Location of Interacting Facilities," in Foundations of Location Analysis, (Edited by H.A. Eiselt and V. Marianov). pp: 273-288, Springer’s International Series in Operations Research and Management Science, Springer, 2011.
  • Citing Source:
    van der Heijden, Matthieu; Iskandar, Bermawi P., Last time buy decisions for products sold under warranty, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 224 (2), pp. 302-312, JAN 16 2013.
    Cited Source:
    Samatlı-Paç G., Taner M.R., "The role of Repair Strategy in Warranty Cost Minimization: An Investigation via Quasi-renewal Processes," European Journal of Operational Research, vol. 197 (2), pp. 632-641, 2009.
  • Citing Source:
    Lobo, Benjamin J.; Hodgson, Thom J.; King, Russell E.; Thoney, Kristin A.; Wilson, James R., An effective lower bound on L-max in a worker-constrained job shop, COMPUTERS & OPERATIONS RESEARCH, vol. 40 (1), pp. 328-343, JAN 2013.
    Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE Transactions, 34 (9), 803-811, Sep 2002
  • Citing Source:
    Lobo, Benjamin J.; Hodgson, Thom J.; King, Russell E.; Thoney, Kristin A.; Allocating job-shop manpower to minimize Lmax: Optimality criteria, search heuristics, and probabilistic quality metrics, COMPUTERS & OPERATIONS RESEARCH, vol. 40 (10), pp. 2569-2584, 2013.
    Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE Transactions, 34 (9), 803-811, Sep 2002
  • Citing Source:
    Aros-Vera, Felipe; Marianov, Vladimir, Mitchell John E.; p-Hub approach for the optimal park-and-ride facility location problem, EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, vol. 226, pp. 277-285, 2013.
    Cited Source:
    B.Y Kara, M.R. Taner, "Hub Location Problems: The Location of Interacting Facilities," in Foundations of Location Analysis, (Edited by H.A. Eiselt and V. Marianov). pp: 273-288, Springer’s International Series in Operations Research and Management Science, Springer, 2011.
  • Citing Source:
    Vanhoucke, M; An overview of recent research results and future research avenues using simulation studies in project management, ISRN COMPUTATIONAL MATHEMATICS, vol. 2013, 51549, SEP 11, 2013.
    Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), pp. 219-232, 1999.
  • Citing Source:
    Vanhoucke, M; Schedule risk analysis, Project Management with Dynamic Scheduling, Springer, pp. 81-100, SEP 2013.
    Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), pp. 219-232, 1999.
  • Citing Source:
    Lobo, Benjamin J.; Wilson, James R.; Thoney, Kristin A.; Hodgson, Thom J.; King, Russell E., A practical method for evaluating worker allocations in large-scale dual resource constrained job shops, IIE TRANSACTIONS, vol. 46 (11), pp. 1209-1226, 2014.
    Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE TRANSACTIONS, 34 (9), 803-811, Sep 2002
  • Citing Source:
    O’Kelly M.E.; Air freight hubs in the FedEx system: analysis of fuel use, JOURNAL OF AIR TRANSPORT MANAGEMENT, vol. 36, pp. 1-12, 2014.
    Cited Source:
    B.Y Kara, M.R. Taner, "Hub Location Problems: The Location of Interacting Facilities," in Foundations of Location Analysis, (Edited by H.A. Eiselt and V. Marianov). pp: 273-288, Springer’s International Series in Operations Research and Management Science, Springer, 2011.
  • Citing Source:
    Lobo, Benjamin J.; Thoney, Kristin A.; King, Russell E., Wilson, James R.; A probabilistic characterization of allocation perfromance in a worker-constrained job shop; Essays in Production, Project Planning and Scheduling, International Series in Operations Research and Management Science, vol. 200, pp. 301-341, 2014.
    Cited Source:
    Thoney K.A., Hodgson T.J., King R.E., Taner M.R., Wilson A.D., "Satisfying Due-Dates in Large Multi-factory Supply Chains", IIE Transactions, 34 (9), 803-811, Sep 2002
  • Citing Source:
    Xin, Zi-ling; Pan, Xing, Research on the Project Critical Activity Uncertainty Risk Assessment, 60TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), Colorado Springs, CO, JAN 27-30, 2014.
    Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), pp. 219-232, 1999.
  • Citing Source:
    Acebes, Fernando; Pajares, Javier; Galan, Jose Manuel; Lopez-Paredes, Adolfo, Exploring the influence of seasonal uncertainty in project risk management, Selected papers from the 27th IPMA, World Congress, Dubrovnik, Croatia, 2013, vol. 119, pp. 329-338, MAR 2014.
    Cited Source:
    Elmaghraby S.E., Fathi Y. and Taner M.R., "On the Sensitivity of Project Variability to Activity Mean Duration", International Journal of Production Economics 62 (3), pp. 219-232, 1999.
  • Citing Source:
    Sels, Veronique; Vanhoucke, Mario; A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups, COMPUTERS & OPERATIONS RESEARCH, vol.39 (10), pp. 2346-2358, OCT 2012.
    Cited Source:
    Taner M.R., Hodgson T.J., King R.E. and Schultz S.R., “Satisfying due-dates in the presence of sequence dependent family setups with a special comedown structure,” Computers and Industrial Engineering vol.52, pp.57-70, 2007.
  • Citing Source:
    Sels, Veronique; Vanhoucke, Mario; A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups, COMPUTERS & OPERATIONS RESEARCH, vol. 39 (10), pp.2346-2358, OCT 2012.
    Cited Source:
    Schultz S.R., Hodgson T.J., King R.E., Taner M.R., "Minimizing Lmax for the single machine scheduling problem with family set-ups," Int J of Production Research, vol. 42, pp. 4315-4330, 2004.

Sayfalar